Bathrooms Installed But a Big Issue in One of Them

The report was that the bathrooms were done. When we got the pictures, we decided that we weren’t quite there yet in the upstairs bathroom.

Master Bathroom

Here, I think we are all done. All fixtures, cabinetry, tiling, and lighting have been installed.

Master Bath Vanity and Mirror
Master Bath Vanity and Mirror
Click image to enlarge
Master Bath Shower
Master Bath Shower
Click image to enlarge

Downstairs Bathroom

With the exception of the decorative vanity that Johnny is working on, we’re done here, too.

Downstairs Bath Vanity Location
Downstairs Bath Vanity Location
Click image to enlarge
Downstairs Bath Shower Head
Downstairs Bath Shower Head
Click image to enlarge

Upstairs Bathroom

Anne took one look at the pictures below and said, “I don’t like it. The sink is too big and it sits up too high and sticks out to far forward.”

We decided that this was caused by the width of the room and the placement of the shower and door. We were left with space for only a shallow vanity, so the sink we chose is too big and the wrong shape. We had never seen a complete drawing of this unit from the side, where the problem is apparent. We’d only seen straight-on views.

Anne immediately wrote to Kevin and sent him some other sink ideas. Kevin and Angelo will make an adjustment.

Upstairs Bath Looking Into Hall
Upstairs Bath Looking Into Hall
Click image to enlarge

 

 

 

 

Upstairs Bath Vanity and Sink
Upstairs Bath Vanity and Sink
Click image to enlarge

 

 

 

 

 

 

 

 

UPDATE

Here’s the new sink for the upstairs bathroom… much better!