Kevin asked the Director of Works, the geometra Jimmy, to make a report at the end of each month.
Here’s why this report is important:
- To make sure the director of works is frequently on site
- To ensure he is FORMALLY reporting back on a monthly basis that all works are proceeding as per contract and as per applicable building codes to ensure certification at end of project
- To make sure end-of-project certifications are a “formality” and not a point of confusion as the director of works will need only revert to his/her monthlies and other notes
- To keep the builder on his toes knowing that every month there will be a document that reviews his prior month’s work
Progress on the project has been steady once they were able to resume work after the bad weather. I’d say we’re 2-3 weeks behind the original schedule, but they say they can make up the time. (See update below the report.)
Here’s the February report.
An Update
Today we received the Giorni Persi per Maltempo report. This “Days Lost due to Bad Weather” report says that they have lost 2 days to snow and 5 to rain. (These days would be added to the end of the contract term, if need be.) So we’re a little closer to on schedule than I estimated above.
Source:
Image: Copyright © Our Big Italian Adventure