Despite the temperatures that have regularly exceeded 40°C (104°F) and reached at least 43°C (109°F), they have been continuing to work on, of all things, the roof. You have to admire our crew’s commitment and perseverance.
They have completed the tiling of the main roof on the front side of the house. It’s great how they used older tiles for the top layer, giving the house an older look.

Click image to enlarge
I think work now moves to the back side, where the solar and photovoltaic panels will be. That may be a longer process, and even more in the afternoon sun, being on the west side. Fortunately, the heat is supposed to subside, at least a little bit: only one day over 35°C (95°F) during the upcoming week.
Work is also continuing inside, installing window and door frames.