Following on the work from last week where they prepared the top floor base, they began to pour the concrete.
The concrete crane is here to distribute the concrete. It gets a supply of concrete from a truck that sits behind it and pipes it up to the top floor.

Click to Enlarge
Before the concrete trucks arrived, a first step was to lay a grid of rebar on top of the Poroton blocks that was tied into the rest of the rebar. Here’s a picture of the grid in place, after they had started the pour.

Click to Enlarge
This shot shows the strength of the perimeter rebar that ties the grid together.

Click to Enlarge
Here is the album of today’s photos.