Progress on the Interior Flooring, Bathrooms, Electrical, and More
Now that the work is focused on finishing the inside, lots of projects are underway at the same time. We got a large collection of photos today showing some of this work.
Bathrooms
Pieces of each bathroom are in place, including some tile and fixtures, but more work remains for after the winter holiday.
Electrical and Stairs
Many of the photos were of different electrical connections. They’re not very interesting to look at, but they’re at the stage where they can add switches and outlets,
All the structural work for the stairs is complete. Tiling and railings will come next.
Walls and Floors
The tile is now in place everywhere except the stairs and the walls are ready for painting.

Click image to enlarge

Click image to enlarge
Source:
All images: Copyright © Our Big Italian Adventure
Interior Tiling And Some Work on the Heating System
Work is progressing in bits and pieces on many fronts inside the house these days.
They are working to install the top floor tiling. It looks fine to me, but Anne was immediately concerned about the spaces and the dark lines between the tiles. She had asked that these tiles be laid very close together, with a minimal grout line.
Kevin reassured us that the floor will look fine once it is all laid and the grout is applied.

Click image to enlarge

Click image to enlarge
Downstairs they are installing additional parts of the underfloor heating system.

Click image to enlarge

Click image to enlarge
An Update
Now that the grout is in, Anne is all set with the look.

Click image to enlarge
Source:
All images: Copyright © Our Big Italian Adventure
Tiling and a Whole Lot More With Some Great Photos of the View
It’s been about 3 weeks since we received any photos. Anne asked Kevin if work was progressing, and he responded with a bundle of photos showing a lot of different projects underway.
The front of the house is looking very nice. Work is continuing on the retaining wall up the hill.
Tile is going in the kitchen area of the main room and on the marciapiede that surrounds the house.
The terrazza tile is done, and the views from the terrazza looking southwest are wonderful.
Inside, the stone wall is grouted and the heating control box is connected to the underfloor tubes.

Click image to enlarge

Click image to enlarge
Also, the interior is being prepped for painting, some of the bathroom fixtures are in, and utility connection boxes have been set in the ground outside.
Here are all the photos of the various projects underway.
Source:
All images: Copyright © Our Big Italian Adventure
More Excitement! Underfloor Heating Pipes Upstairs
Not much to see today: just the installation of the underfloor heating pipes on the top floor.
Source:
All images: Copyright © Our Big Italian Adventure
Underfloor Heating Pipes A Snake of Pipes
On top of the base layer of the underfloor heating, they have started installing the heating pipes.

Click image to enlarge
Anne looked at the photo below and said it looks like a crime scene, with a chalk outline of a murdered boa constrictor.

Click image to enlarge
Here are more snakes.
Source:
All images: Copyright © Our Big Italian Adventure