Tiling and a Whole Lot More With Some Great Photos of the View

It’s been about 3 weeks since we received any photos. Anne asked Kevin if work was progressing, and he responded with a bundle of photos showing a lot of different projects underway.

The front of the house is looking very nice. Work is continuing on the retaining wall up the hill.

Front from Kitchen Side
Front from Kitchen Side
Click image to enlarge
Base of the Retaining Wall
Base of the Retaining Wall
Click image to enlarge

Tile is going in the kitchen area of the main room and on the marciapiede that surrounds the house.

Kitchen Tile
Kitchen Tile
Click image to enlarge
Tile Along the Back
Tile Along the Back
Click image to enlarge

The terrazza tile is done, and the views from the terrazza looking southwest are wonderful.

From Terrazza Looking Uphill
Terrazza and Roof Tile
Click image to enlarge
Southwest from the Terrazza
Southwest from the Terrazza
Click image to enlarge

Inside, the stone wall is grouted and the heating control box is connected to the underfloor tubes.

Interior Stone Wall Grouted
Interior Stone Wall Grouted
Click image to enlarge
Heating Pipe Connections
Underfloor Heating Pipe Connections
Click image to enlarge

Also, the interior is being prepped for painting, some of the bathroom fixtures are in, and utility connection boxes have been set in the ground outside.

Here are all the photos of the various projects underway.