It’s been about 3 weeks since we received any photos. Anne asked Kevin if work was progressing, and he responded with a bundle of photos showing a lot of different projects underway.
The front of the house is looking very nice. Work is continuing on the retaining wall up the hill.
Tile is going in the kitchen area of the main room and on the marciapiede that surrounds the house.
The terrazza tile is done, and the views from the terrazza looking southwest are wonderful.
Inside, the stone wall is grouted and the heating control box is connected to the underfloor tubes.

Click image to enlarge

Click image to enlarge
Also, the interior is being prepped for painting, some of the bathroom fixtures are in, and utility connection boxes have been set in the ground outside.